goeduck
Super Member
Holy schmokes! You should never not ever have a problem with that leach field. Very Nice!
I'm just glad it's behind me.:laughing
It seems like it's taking forever to get the trusses. They are supposed to be delivered next week. :thumbsup:
I have been able to get the propane tank installed, the septic system and the front and back porches/patio's poured. And, the conduit for the power is installed. Total of 1300' with 450 of that going to a neighbor that is also building.
The down side.:mur:
The Health inspector gave us 4 criteria to meet for the septic system to pass. The first one contradicted the last one but we followed his instruction to the tee except for the first criteria. Well, he failed it and said the whole leach system needed to be lowered 1 foot. It's total BS!!! I read his instruction to him and his reply was; "I agree it was confusing and poorly written, but I can't pass this off". So I get to do the leach field again. To be clear the sewer from the house and septic tank and the line to the distribution box are fine. Just the leach field needs to lower. Still a royal PITA.
Here are a few pictures of the progress.
Propane tank.
View attachment 569904
Carpenters.....MAN YOUR NAILGUNS!!!
Yes, they need to be on the ready and get it dried in. Personally there is something satisfying about hammering nails with a wood handled hammer that I can not break away from. But in this case weather is on its way, nailgun away !