This is finally happening! After lots of headaches and emails we have actually made progress in building our home. We started back in Oct '12. We bought 12.86 acres in gods country. I had my wife on board with moving to the country and raise our son and wanting to get away from all the headaches of town.
I started by getting a survey crew out to help locate the pins. We were able to find all but one! That elusive one could have been found for a hefty price due to the amount of chopping needed. I figured, it'll be ok. I'll find it...more in that later.
I knew I wanted to leave a buffer for the privacy and also keep the dust down. It's still 5 years till the road gets paved so to make the best of it we left about 60' along the roads. I drug a Dozer out dec 22 2012 and officially started clearing. This was slow going for me by myself. I was able to underbrush and burn off a couple acres before having to do some figuring. Here's the beginning. It was pretty thick.
We have a creek that runs right down the middle and it's decent sized. I was able to track down a big culvert to aid in accessing the back of the property. Here's the culvert installed temporarily.
I'll add more pics to get us caught up to where we are now when I'm on a PC. We are scheduled to pour our slab on thurs or Friday!
Some specs on the house
3 bd/2.5 bath
2703 living sq ft
750 sq ft covered porches
4000 sq ft slab
Minimum 10' walls with 8' doors
2x6 studs
Stained concrete floors throughout
Very nice kitchen for my bride
I plan on keeping this updated so we can tell the story of building our first home. Once the house is dried in, we will move out there and stay in our camper.
Brett
Any tips or tricks please share.
I started by getting a survey crew out to help locate the pins. We were able to find all but one! That elusive one could have been found for a hefty price due to the amount of chopping needed. I figured, it'll be ok. I'll find it...more in that later.
I knew I wanted to leave a buffer for the privacy and also keep the dust down. It's still 5 years till the road gets paved so to make the best of it we left about 60' along the roads. I drug a Dozer out dec 22 2012 and officially started clearing. This was slow going for me by myself. I was able to underbrush and burn off a couple acres before having to do some figuring. Here's the beginning. It was pretty thick.

We have a creek that runs right down the middle and it's decent sized. I was able to track down a big culvert to aid in accessing the back of the property. Here's the culvert installed temporarily.

I'll add more pics to get us caught up to where we are now when I'm on a PC. We are scheduled to pour our slab on thurs or Friday!

Some specs on the house
3 bd/2.5 bath
2703 living sq ft
750 sq ft covered porches
4000 sq ft slab
Minimum 10' walls with 8' doors
2x6 studs
Stained concrete floors throughout
Very nice kitchen for my bride
I plan on keeping this updated so we can tell the story of building our first home. Once the house is dried in, we will move out there and stay in our camper.
Brett
Any tips or tricks please share.