I have 50 plus grease points between the loader, the hoe, the 4-n-1, and the hydraulic thumb.
It is easiest to grease the loader if I move it into two different positions, and the hoe requires at least 4 positions, full left, full right, straight extended and straight retracted, although I can do it in 3 but not in the same logical sequence as if I use 4.
Even on the best day this takes at least an hour, and five engine starts. There are enough calendar days between greasings that I never develop a real routine, so 90 minutes is not too far off.
It is easiest to grease the loader if I move it into two different positions, and the hoe requires at least 4 positions, full left, full right, straight extended and straight retracted, although I can do it in 3 but not in the same logical sequence as if I use 4.