would this save time

   / would this save time #1  

washita

Silver Member
Joined
Feb 24, 2009
Messages
228
Location
south western michigan
Tractor
pt 425, JI Case, Gravely Comm.10A
I have the 425 and a rotiller, I am replacing the sidewalk at the rental property. Currently the process is dig up cement then rototill then scrape out loose dirt with scraper blade. I wonder if I could combine the tilling and scraping operation by mounting the cutter blade from the scraper onto the back bottom edge of the tiller. This might be too much for the 425 to do a one time?
 
   / would this save time #2  
When I replaced my sidewalk I removed the old concrete, soaked down the ground, let it sit overnight and then dug out the dirt with the bucket. I do have nice soil with few rocks. I dug out 4" of soil and put in gravel and compacted for my base.

I don't have a tiller for my 425 but I'm guessing tilling and trying to pull very much dirt at the same time would be a bit too much.
 

Tractor & Equipment Auctions

PAIR OF 5' PIN ON FOLD UP RAMPS (A51247)
PAIR OF 5' PIN ON...
UNVERFERTH 330 8 AND 1/2 INCH EXTENSION STUB TUBE WELDMENT FOR FRAME (A53472)
UNVERFERTH 330 8...
Pallet Fees (A50775)
Pallet Fees (A50775)
2020 RAM Promaster City Mini Van (A53117)
2020 RAM Promaster...
2025 SDLANCH IRGC40 UNUSED Electric Tricycle (A53117)
2025 SDLANCH...
21000 (A51694)
21000 (A51694)
 
Top