I need to add material to my gravel road.
I am planning to add as much as 50 tons of recycled concrete.
(2 large dump trucks, tail gated)
I can get said material within 20 miles from my house for $9/ton, but they do not deliver.
So I will start calling local hauling companies, but I have NO IDEA what is a reasonable rate.
Like i said, it is approx 20 miles between the material and my house. call it 40 per rd trip, 2 rd trips for a large box dump truck. 80 miles (less actually) and about 2 hours of driving, and maybe 1/2 hour of tailgating.
What is a reasonable rate?
Thanks in advance,
David
I am planning to add as much as 50 tons of recycled concrete.
(2 large dump trucks, tail gated)
I can get said material within 20 miles from my house for $9/ton, but they do not deliver.
So I will start calling local hauling companies, but I have NO IDEA what is a reasonable rate.
Like i said, it is approx 20 miles between the material and my house. call it 40 per rd trip, 2 rd trips for a large box dump truck. 80 miles (less actually) and about 2 hours of driving, and maybe 1/2 hour of tailgating.
What is a reasonable rate?
Thanks in advance,
David