I just got an estimate for concrete work on a tractor barn that I'm building. I'm curious if this looks like it is in the ball park to those of you that have done this before. Here are the specifics:
-Excavation work is already done so it is not included in the bid. Footer is over excavated by about a foot on each side of the footer. Bottom of trench is with 2" of level all around.
- Outside dimensions of footer: 41' x 27'4"
- Footer width 20"
- Footer depth 8"
- Outside dimensions of stem wall 40'2" x 26'6"
- Stem wall thickness 10"
- Stem wall height 4'
- Using #5 rebar. One pair of horizontal rebar runs throughout footer. Three pairs of horizontal rebar runs throughout stem wall. Veritical rebar in stem wall every eight feet.
- 4" concrete slab using premix fibre mesh.
Concrete contractor is supplying all materials including expansion joint material, 6 mil plastic under slab, footing forms, stem wall forms, whalers, rebar, etc.
Used $85/yard for concrete price.
Bid was $11,000 for all materials and labor. About how much labor would this involve? He said he figured 2 to 2.5 weeks.
Does this look like it is in the ball park, a really good deal, or I'm being played for a sucker?
Also, I'm in southern Colorado if that makes any difference.
thanks for any help
-Excavation work is already done so it is not included in the bid. Footer is over excavated by about a foot on each side of the footer. Bottom of trench is with 2" of level all around.
- Outside dimensions of footer: 41' x 27'4"
- Footer width 20"
- Footer depth 8"
- Outside dimensions of stem wall 40'2" x 26'6"
- Stem wall thickness 10"
- Stem wall height 4'
- Using #5 rebar. One pair of horizontal rebar runs throughout footer. Three pairs of horizontal rebar runs throughout stem wall. Veritical rebar in stem wall every eight feet.
- 4" concrete slab using premix fibre mesh.
Concrete contractor is supplying all materials including expansion joint material, 6 mil plastic under slab, footing forms, stem wall forms, whalers, rebar, etc.
Used $85/yard for concrete price.
Bid was $11,000 for all materials and labor. About how much labor would this involve? He said he figured 2 to 2.5 weeks.
Does this look like it is in the ball park, a really good deal, or I'm being played for a sucker?
Also, I'm in southern Colorado if that makes any difference.
thanks for any help