I need to get some 30" legs under a heavy, 2 ton platform. It is basically built out of 4" channel , 8 x 15 with 10 legs underneath. My first thought was to stitch some 4" channel that I had for legs , but then thought I may be best with some heavy box or round tube. Dare I consider schedule 40 pipe?