jjcc246
Gold Member
I'm stripping top soil for a 28' x 32' garage i'm building. I'm using my TC-30 with a FEL. What i'm doing right now is curling the bucket all the way back and cutting and dragging the soil. I'm getting a lot of "skip" on the bucket making the ground uneven and going over it several times to try and smooth it out, thus taking a very long time. Anybody out there have a better way of doing it without hiring someone with a dozer? I'm doing a floating concrete slab and I want to get it on solid ground to lessen the chance of heving and craking. Thanks in advance for your replies.