Dave5264
Gold Member
- Joined
- May 25, 2009
- Messages
- 376
- Location
- Near North Ontario Canada
- Tractor
- 08 Montana C5264, 2011 McCormick CX100 XS
Well, this weekend i setup the horse paddocks, or started to.
I got all the Cedar posts in, Used a Post Pounder instead of a PHD, I was averaging one post every 5-6 minutes or so. It took 12 hours to put in 150 posts, each one 8' long and rage in diamiter from 5 to 10 ". I Just cant imagine using a PHD to do 150 of these things, id still be there digging, leveling and packing.
It took an added 4 hours to put in the Corner and Gate diagonal Braces.
Just the Electric fence wire to string up now and Gates to install.
I got all the Cedar posts in, Used a Post Pounder instead of a PHD, I was averaging one post every 5-6 minutes or so. It took 12 hours to put in 150 posts, each one 8' long and rage in diamiter from 5 to 10 ". I Just cant imagine using a PHD to do 150 of these things, id still be there digging, leveling and packing.
It took an added 4 hours to put in the Corner and Gate diagonal Braces.
Just the Electric fence wire to string up now and Gates to install.