As the title says, needed a pole building quick for storage.
Had issue with the pad. Nobody would call back. I'm still waiting for call backs from April!
So, I had to bite the bullet and do it myself. Took a week of evenings and some long days.
One side needed to come up 3 1/2 ft. Pad size was 70x120. A bit large for the building, but I
prefer to have the space for drainage etc.
The 36x48x12 building was 2 days start to finish. Whew. What a workout.
But not for me. I just flexed my wallet:laughing:. $13,100 total plus what ever I had into the pad.
I thought that was a good price! The inside surface still needs to be done with stone too.
I was not around for the build, so a discrete trail camera was set up to monitor the progress.
Had issue with the pad. Nobody would call back. I'm still waiting for call backs from April!
So, I had to bite the bullet and do it myself. Took a week of evenings and some long days.
One side needed to come up 3 1/2 ft. Pad size was 70x120. A bit large for the building, but I
prefer to have the space for drainage etc.
The 36x48x12 building was 2 days start to finish. Whew. What a workout.
But not for me. I just flexed my wallet:laughing:. $13,100 total plus what ever I had into the pad.
I thought that was a good price! The inside surface still needs to be done with stone too.
I was not around for the build, so a discrete trail camera was set up to monitor the progress.