bhostasa
Silver Member
Hi all. I'm about to install 1500' of invisible fence around our property. My problem is I can't decide the best method to do this installation. Should I buy a sub soiler (approx. $175) and mount a 1" pipe to the rear of it to lay the wire or should I rent one of the walk behind ground cutters (approx. $50)?
I'm leaning towards the sub soiler because I'll be dealing with tree roots for about 75% of the job but it is more expensive than renting the other unit. I need to stay about 3" deep throughout. Has anyone used the ground cutter in a heavily wooded area? If so, how did it do?
Any feedback would be appreciated. Thanks!
I'm leaning towards the sub soiler because I'll be dealing with tree roots for about 75% of the job but it is more expensive than renting the other unit. I need to stay about 3" deep throughout. Has anyone used the ground cutter in a heavily wooded area? If so, how did it do?
Any feedback would be appreciated. Thanks!