12' by i want to say 24' by 8 feet tall. room was put into one of the sheds.
2x8 construction for walls and ceiling.
rolled insulation in the walls and ceilings.
then 1/2" thick foil on back and front styrofoam board put over that.
there are 2 outside walls that did get studdied walls. and 2" stryofoam was used to fill in the gaps between the pole barn lumber and metal on the outside. then a layer of 1" thick foil on back and from stryofaom board put over that.
everything was sealed up nice and tight with "great stuff" red can spray foam closed cell
5 shelving units. all 8' long, with 3 shelves
A- 19" wide
B- 4' wide
C- 3' wide
D- 4' wide
E- 16" wide
some wall board that you can hang hooks from was placed along one side.
spacing is approx 3 feet between all shelving and main walk way.
=========================
built today or should say frame work for a 4x4x4 foot light box with legs on caster wheels. to take pictures for the internet. waiting for my mom or aunt to find cloth for it. and then need to setup spots for lights, and switches for the lights.
=========================
this project will most likely come to stand still. till yet another project gets done. that is running electricity out to this shed. i kinda pulled the wires out last year, putting in new gas lines and moving the LP tank.
the other shed has updated electrical, but just haven't been able to dig trench to this shed and get a new panel up and going yet.
==========================
will need to setup a dehumidifier, and heating / cooling for inventory room. so wax and glues don't melt, and moisture doesn't become a problem. really can't do much till electricity is done.
to dark today to take photos. that and grain bin into shed project took over.
2x8 construction for walls and ceiling.
rolled insulation in the walls and ceilings.
then 1/2" thick foil on back and front styrofoam board put over that.
there are 2 outside walls that did get studdied walls. and 2" stryofoam was used to fill in the gaps between the pole barn lumber and metal on the outside. then a layer of 1" thick foil on back and from stryofaom board put over that.
everything was sealed up nice and tight with "great stuff" red can spray foam closed cell
5 shelving units. all 8' long, with 3 shelves
A- 19" wide
B- 4' wide
C- 3' wide
D- 4' wide
E- 16" wide
some wall board that you can hang hooks from was placed along one side.
spacing is approx 3 feet between all shelving and main walk way.
=========================
built today or should say frame work for a 4x4x4 foot light box with legs on caster wheels. to take pictures for the internet. waiting for my mom or aunt to find cloth for it. and then need to setup spots for lights, and switches for the lights.
=========================
this project will most likely come to stand still. till yet another project gets done. that is running electricity out to this shed. i kinda pulled the wires out last year, putting in new gas lines and moving the LP tank.
the other shed has updated electrical, but just haven't been able to dig trench to this shed and get a new panel up and going yet.
==========================
will need to setup a dehumidifier, and heating / cooling for inventory room. so wax and glues don't melt, and moisture doesn't become a problem. really can't do much till electricity is done.