Stomper
Gold Member
I am needing to install several smaller screw piles (pylex) for a deck that I am going to build and I have been tossing around the idea for building a simple hyraulic instalation tool to bolt onto the bucket of my tractor and be run off of my third function. I would build a basic frame and just use the hydraulic motor from my capstan winch. The problem is that the motor was sized to give me 60 rpm at idle for the capstan and I would like to have around half of that or less for the screw piles. Can I just add a flow control valve on the unit that I will build (after the third function valve) to slow the rpm down. Will I need to install a line back to tank from the flow control valve for the unused folw? Or would it be best to run hoses from my rear remotes?
Last edited: