DCJL
Silver Member
I'm about to get my GradeMaster delivered and need to build up my road. I need to add a total of 6 inches to it. I have a 700' driveway with a fairly steep pitch. With using the GradeMaster do you feel I should build up the road with gravel alone, gravel underneath and then Stamatte, or just Stamatte? I'm not overly concerned with the cost difference between the 2 materials, more concerned with what will work better with the GradeMaster and holding the road together.
I live in New England where we get lots of snow, rain and mud season if the road is not prepared correctly.
I live in New England where we get lots of snow, rain and mud season if the road is not prepared correctly.