Don't know much about building but have been reading up on foundations and such. Have a quick question.
Where I'm thinking about building the current grade is about 3 feet below what would be finish grade so would be bringing the foundation up that high and filling. Our frost line is 5' down. Does that mean I need to dig 2 feet down and with the 3 feet of fill I'd have 5' from the surface, or do I still have to dig 5' down?
Thanks as always.
Where I'm thinking about building the current grade is about 3 feet below what would be finish grade so would be bringing the foundation up that high and filling. Our frost line is 5' down. Does that mean I need to dig 2 feet down and with the 3 feet of fill I'd have 5' from the surface, or do I still have to dig 5' down?