i was reading on the web somewhere that the required depth for pvc conduit is 18" and the required depth for rigid metal conduit is 6". is rigid metal conduit the same as EMT? do these depths sound right?
i am burying a wire from my workshop building to my high tunnel...about 60'. this is to run an inflation blower and ventilation fans.
i am burying a wire from my workshop building to my high tunnel...about 60'. this is to run an inflation blower and ventilation fans.