Dam removal time lapse video

/ Dam removal time lapse video #1  

bcp

Super Star Member
Joined
Jul 8, 2009
Messages
14,933
Location
SW WA
Tractor
Kubota BX2360

From the article:

"Removing the old dam was no small job. According to Pete Barber, restoration ecologist for the Cowlitz Indian Tribe, removing 20,000 cubic yards of materials that made up the 425-foot-long, 55-foot-tall dam required planning and coordination. Barber said it was one of the largest dam-removal projects in the state’s history."


Bruce
 
Last edited:

Marketplace Items

2020 John Deere 470G Hydraulic Excavator (A61572)
2020 John Deere...
FORD 8530 TRACTOR (A58375)
FORD 8530 TRACTOR...
2019 Kenworth T880 Tri-Axle Dump Truck (A61573)
2019 Kenworth T880...
(7) 40"X104" METAL FRAMES (A64280)
(7) 40"X104" METAL...
2007 GMC C4500 Service Truck (A62679)
2007 GMC C4500...
MONTANA 3240 TRACTOR (A64280)
MONTANA 3240...
 
Top