anthonyk
Gold Member
I've got a driveway covered in about 4 to 5 inches of crushed concrete.
When we first did it, we compacted the crap out of the select fill dirt road base, dumped the concrete, spread it with the trusty box blade, then wet it and rolled it with a huge smooth, vibratory roller. It's held up very well, but lately a few low spots have developed which hold water. No big deal but I was going to have about 20 cubic yards dropped off, and sort of touch everything up.
The guy that's delivering the crushed concrete says there's no need to wet and roll it, just spread it and drive over it with the tractor (I've got a Century 3647 47 Hp with FEL and R4 tires).
Is he right?? Is that enough compaction?
Any tips from someone with experience would be appreciated
)
Anthony
When we first did it, we compacted the crap out of the select fill dirt road base, dumped the concrete, spread it with the trusty box blade, then wet it and rolled it with a huge smooth, vibratory roller. It's held up very well, but lately a few low spots have developed which hold water. No big deal but I was going to have about 20 cubic yards dropped off, and sort of touch everything up.
The guy that's delivering the crushed concrete says there's no need to wet and roll it, just spread it and drive over it with the tractor (I've got a Century 3647 47 Hp with FEL and R4 tires).
Is he right?? Is that enough compaction?
Any tips from someone with experience would be appreciated
Anthony