Hmmm, old thread but still of some casual interest.
I picked up a C-86 a few years after the Century collapse.
AmJawa was still kinda/sorta in business with a yard and half a warehouse full of parts.
They were getting into scooter imports, still had a lot of Zetor parts too.
I was able to pick up the hoe, sub-frame and two buckets for $5K even.
FORTUNATE routing and scheduling got me to Harrisburg with an empty horse trailer (other than some manure).
Unloading, not too bad with pallet forks and PATIENCE to do it safely.
NO PROBLEM assembling it single handed and while I can't claim to have used it a LOT, it has certainly been handy.
Right now I am thinking about a thumb for it (AGAIN, this comes up once in a while).
Michigan Iron offer a nice set up, a mechanical thumb that they offer hydraulic upgrade kit for.
The shared bucket hinge pin seems like a good idea, no matter where the thumb is the bucket teeth meet it at the same point.
Here
Anyone here have this set-up ? or any other C-86 and thumb ?