I've got several bad spots where the asphalt has busted and these are pretty big spots. Too big for a cold patch type filler. I've tried those cold patch fillers and have never been happy with them.
I'm just in the "cypher'n" stage now and thought I'd elicit suggestions from the board.
I've isolated most of the bad spots by cutting them out w/a concrete/masonary blade on a circular saw so they aren't growing but they are an eyesore.
The options as I see it are:
1) recover with a light coat of asphalt. (I question the longevity of this).
2)square up the spots then just have them filled in w/ hot asphalt. (Shame the cost is up there to get hot asphalt and associated eqt on site).
3)tear the effected area out down to the gravel and have it resurfaced.
The 2 effected area's are approx 11' x 8' (to patch) or 11' x 40' to resurface and several 2' x 3' spots in a 20' x 30' area. (probably more cost effective in the big picture and I can tear it out w/my BX23)
The rest of the driveway is in good shape (12' x 200') but it'll need resealing before summer.
I've kept it sealed over the years but the damage was primarily done when I had to have about 71 yards of dirt hauled in to fill in a pool and some other holes. The asphalt didn't hold up very well in some spots.....
Suggestions?
I'm just in the "cypher'n" stage now and thought I'd elicit suggestions from the board.
I've isolated most of the bad spots by cutting them out w/a concrete/masonary blade on a circular saw so they aren't growing but they are an eyesore.
The options as I see it are:
1) recover with a light coat of asphalt. (I question the longevity of this).
2)square up the spots then just have them filled in w/ hot asphalt. (Shame the cost is up there to get hot asphalt and associated eqt on site).
3)tear the effected area out down to the gravel and have it resurfaced.
The 2 effected area's are approx 11' x 8' (to patch) or 11' x 40' to resurface and several 2' x 3' spots in a 20' x 30' area. (probably more cost effective in the big picture and I can tear it out w/my BX23)
The rest of the driveway is in good shape (12' x 200') but it'll need resealing before summer.
I've kept it sealed over the years but the damage was primarily done when I had to have about 71 yards of dirt hauled in to fill in a pool and some other holes. The asphalt didn't hold up very well in some spots.....