Just had a new asphalt driveway installed yesterday. 3" base with 3" blacktop over existing gravel driveway which was pretty well packed. My contract says 9 days before I can operate a passenger vehicle over it.
Tractor is an L3560 with loaded rear tires, larger LA805 loader, 500 lb ballast...