Well I took a old drive out because it was all silt and limestone, took 6in out and put geotextial fab down. Then brought In 4 in of 57 (1-1/2. -- 1/2) limestone in and back bladed it. Well I need 4x4 to get In and out.
I need another 22ton load and don't know if it should be 57's then roll it...