I found the same thing using the search option on my phone in my photos. I made a screenshot & it searched away. I didn't think it look very old myself.
Here in NC, the power company usually runs the underground and overhead services. Underground is supposed to be 36" deep & conduit is not required unless you are going to cover a section with concrete. Rigid galvanized conduit is required for overhead services running thru a roof where it has...
I have seen some made up that will sit on the ground when lifting a heavy load up high. That way they have stability and not pick the front end off the ground.
I have a 3600 Ford Diesel. Maybe one day if I am able, I will buy a tractor with a front end loader!
I have this 3 point forklift attachment I built years ago & I need a hyd top link to tilt up and down to get under logs and drop them off easier. I would like to get more height, but I would...