npalen
Elite Member
Needing to replace the drag link (goes between steering box and front axle) on my B9200 due to wear. Wondering about cutting off the existing ball joints and welding on new ones.
My question regards the taper on the Kubota (B9200) ball joints and whether it is fairly standard. I'm seeing taper callouts on reamers for ball joints of 1 1/2"/ft (7.15 deg), 2"/ft (9.56 deg) and 10:1(5.71 deg.)
TIA
My question regards the taper on the Kubota (B9200) ball joints and whether it is fairly standard. I'm seeing taper callouts on reamers for ball joints of 1 1/2"/ft (7.15 deg), 2"/ft (9.56 deg) and 10:1(5.71 deg.)
TIA