Made a hydraulic top link extension

   / Made a hydraulic top link extension #21  
Except in transport, the toplink deals mostly with compression force. However, if transporting a heavy rotary cutter, your comment is absolutely valid.

whether the top link is in compression or tension the load on the welds is the same - it's a shear load perpendicular to the weld group. since the load is centered about the weld group it doesn't really make much of a difference. there is a slight angular component to the load, since the top link isn't going to be dead perpendicular at all times, but asuming the load is perpendicular the 1/4" overlap isn't much of an issue.

if you had that same 5" long group of welds but the top link attached a few inches above the welds then the difference between the 1/4" overlap and 1" or 2" would become very significant, but as long as the load is centered about the welds then it isn't.
 
   / Made a hydraulic top link extension #22  
you've altered you 3pt geometry by a fair amount by moving the pivot point back those inches. Has it caused any problems for you?
 
   / Made a hydraulic top link extension
  • Thread Starter
#23  
you've altered you 3pt geometry by a fair amount by moving the pivot point back those inches. Has it caused any problems for you?

Not in the least bit. I wandered what it would do, but I can't seem to find any difference other than when the draft arms are all the way down, the top link doesn't hit the PTO shield now.
 
   / Made a hydraulic top link extension
  • Thread Starter
#24  
whether the top link is in compression or tension the load on the welds is the same - it's a shear load perpendicular to the weld group. since the load is centered about the weld group it doesn't really make much of a difference. there is a slight angular component to the load, since the top link isn't going to be dead perpendicular at all times, but asuming the load is perpendicular the 1/4" overlap isn't much of an issue.

if you had that same 5" long group of welds but the top link attached a few inches above the welds then the difference between the 1/4" overlap and 1" or 2" would become very significant, but as long as the load is centered about the welds then it isn't.

Thanks! That was a mouthful. :thumbsup:
 

Tractor & Equipment Auctions

2019 GALYEAN EQUIPMENT CO. 150BBL STEEL (A58214)
2019 GALYEAN...
2002 Miller Trailblazer 301G Towable Welder Generator (A55851)
2002 Miller...
2016 Ford Explorer (A56859)
2016 Ford Explorer...
2017 Mitsubishi Mirage G4 Sedan (A56859)
2017 Mitsubishi...
2023 yamaha (A55758)
2023 yamaha (A55758)
iDrive TDS-2010H ProJack M2 Electric Trailer Dolly (A55851)
iDrive TDS-2010H...
 
Top